Timesheet cost is not included on production cost
Steps to reproduce: 1. Install production_timesheet_cost 2. Create an employee a set an hourly cost of 30.00 3. Create a product with a work with an operation that accepts timesheet lines and a cost center with 0 cost price 4. Start the work and include a timesheet line of 1 hour. Current behaviour: - The cost of the work is zero Excepted behaviour: - The cost of the work is 30.00 (1hour x hourly rate). Found on 7.0 series.