Skip to content
  • Z.J. van de Weg's avatar
    Do not schedule pipelines if the user can't · 1864c5252965
    Z.J. van de Weg authored
    When the owner of a pipelines schedule was either blocked or was removed
    from the project, the pipeline schedular would still schedule the
    pipeline.
    
    This would than fail however, given the user had no access to the
    project and it contents. However, a better way to handle it would be to
    not schedule it at all. Furthermore, from now on, such schedules will be
    deactivated so the schedule worker can ignore it on the next runs.
    1864c5252965