Show landed cost wizard is missing currency symbol
When posting or showing the results of the landed cost, the full cost and the assigned cost appears, but it's missing the symbol currency.
When posting or showing the results of the landed cost, the full cost and the assigned cost appears, but it's missing the symbol currency.